National Repository of Grey Literature 27 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Industrial bakery Herold
Kręželoková, Tereza ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Donaťáková, Dagmar (advisor)
The aim of this bachelor thesis was to design a new industrial bakery for the company Herold Brno. The project is based on an architectural study elaborated in the subject AG035 - Architecture design studio V. - in the third semester of the bachelor's study. The plot designated for the project is located in Brno, in the cadastral area Horní Heršpice. This is an industrial district of the city. The surrounding buildings consist mainly of storage and production halls, toward the center there is a residential buildings and civic amenities. The assigned parcel is currently registered as a brownfield and is intended for production development. The plot is connected to the street „K Terminálu“ and is located in a slightly sloping area. The form of the building is based on the trapezoidal shape of the plot. The designed object consists of three interlocking forms, each of them performs a different function. In first cubic form is placed an entrance hall, a bakery shop, sanitary facilities and lockery rooms for a bakery staff. The second elevated form is placed on the first one and includes administrative promises. In the third and largest form there is a production hall, expedition and storage facilities. The design has industrial character, which is based on the purpose of the object. The main material is concrete, which is used in both – the exterior and interior. The facade is made of exposed concrete, in the interior is used concrete design plaster. The monolithic concrete mass is discontinued by black metal elements, such as window frames or railing, and is lightened by glass segment. An important element is the outdoor atrium, which is located between the production hall and the entrance part, which improve the working environment for employees. Before entering the building there is a barrier-free ramp and exterior stairs. The whole building is barrier-free.
BUT Technology Transfer Center
Muroň, Jakub ; Štikar, Jaroslav (referee) ; Nový, Alois (advisor) ; Skála, Jiří (advisor)
The Bachelor’s Thesis is based on the architectural study done in the summer semester of the third year of bachelor’s studies of the topic Technology tranfer cetre BUT in Brno. Area of Technology transfer centre of BUT (Brno university of technology) is composed of three separated units - two production complexes and main buidling, which is used for administration in first floor and laboratories in second floor. Design is conditioned by two criteria - an adaptation of objects structure to configuration of terrain and a flexibility of function and logistic. Solution to these issues was to create main communication connected with existing communication. It provides easy and fast logistic service for the production complexes. Shape of the buildings follows contour lines. Due to dynamic shapes I designed simple industrial monochromatic facade, which allows an experimentation with the mass of the building. Line of the flat roof was broken by simple skylights. Strip windows potentiate horizontality in contrast with the main building, which has vertically based character. Industrial character of the complex was accentuated by using metallic facade and prefabricated concrete construction.
Proposal of Business Expansion – Building-up of Packaging Unit
Prosecká, Romana ; Hos, Michal (referee) ; Mikulec, Luděk (advisor)
The topic of the thesis is Proposal of Business Expansion - Building-up of Packaging Unit. The proposal is based on the analysis of the current production capacity and production equipment, and on the analysis of money management and ascertained shortcomings. On the basis of the carried out analysis a proposal for building-up of a new production unit and a recommendation on purchase of new machine equipment has been made. A calculation of investment costs is a part of the proposal.
Conversion of Bata Production Buildings
Nedbalová, Monika ; Svoboda, Jiří (referee) ; Nový, Alois (advisor) ; Skála, Jiří (advisor)
The subject of bachelor thesis is a conversion of Bata production buildings no. 24 and 25 to leasable units for small and medium business. The building site is located in the Svit area (Bata´s production areal) in city Zlín. This thesis is based on an architectural study prepared in the summer semester of the second year of study. The aim of the project is to demonstrate the usability of buildings intended for demolition. Objects are world-unique structures with very flexible frame structural system, which is usable for many purposes. This conversion to leasable units for business allows financial autonomy of the objects and predisposes them to permanent use. A system of removable partitions in the interior gives flexibility and universality to a units. The project involves the conversion of existing buildings no. 24 and 25 and new building no. 24/2. The building is designed as the main entrance, from which it is possible to access the two neighboring buildings by connecting bridges in the 3rd and 4th floors. Also provides restaurant and a seasonal rooftop terrace. The basic idea was to preserve valuable architectural expression of buildings in line with the modern concept. Valuable semi-public place is created between no. 24 and 25, whose function is to make more attractive central part of the city Zlín. New building is a landmark for employees and visitors, which integrates other services.
Production of aquariums in Brno
Molčanová, Viktorie ; Obrtlík,, Jan (referee) ; Májek, Jan (advisor) ; Bečkovský, David (advisor)
The aim of the bachelor’s thesis was to develop project documentation for the study of aquariums production for the company called Akvária Pavlica, which was developed within the subject AG035 Studio of Architectural Creation - Production Buildings, in the 3rd year of the bachelor’s study. Due to its business successes, the company needed to build new production capacities and decided to locate the new headquarters in Brno, in the cadastral area of Horní Heršpice, where the surrounding buildings on the south side consist mainly of indoor industrial buildings. The bachelor thesis contains documentation for building permits and implementation documentation. The land is registered as a brownfield, is intended for industrial production, and is connected to Sokolova Street. It is a slightly sloping terrain falling to the north. A part of the former Elplast’s factory building is still situated in the south, which, however, will be demolished. The new building consists of four units. The first consists of an exhibition space and an entrance hall, which is followed by another part with facilities for employees and administration. The third is a carpentry with some storage facilities and technical facilities. The fourth and the largest part represents the production hall. There is an exterior staircase and a barrier-free ramp in front of the entrance from Sokolova Street. There is also a parking lot around the building, paved areas for handling truck vehicles, paved areas for pedestrians and new greenery.
BUSINESS CENTRUM VÍCHOV
Hubený, Jakub ; Velehradská, Dagmar (referee) ; Dýr, Petr (advisor)
The subject of the thesis is the design of an architectural-urban study of a large area (revitalization of brownfield land/sites) on the outskirts of the village of Víchov. The building program defined partly by the investor and then by the pre-diploma project includes a residential part, a part of agricultural land, a part of public spaces, housing for owners and an industrial part. The industrial part has been designed in more detail and includes the following areas: storage/production facilities, sale of farm products in showrooms, accommodation, catering, administration and technical facilities. The aim of the work was to find an architectural solution that would be the most suitable from various contradictory points of view - such as in terms of spatial layout, from an economic point of view, in terms of the integration of the building into the structure of the village and the topography of the landscape, or in terms of the energy (in)performance of the building. The design should also be representative of an appropriate response to global warming.
Production hall with facilities
Malec, Pavel ; Vítámvás, Zdeněk (referee) ; Utíkalová, Ivana (advisor)
The subject of my thesis is to elaborate the project documentation for construction execution of an administrative building with added production hall which is found in the town Benešov near Prague. The object of the administrative building has one underground and free above-ground floors. The underground floor serves for operating purposes connected with production. The first above-ground floor serves for staff catering. On the second above-ground floor we can find social rooms, dressing rooms and washrooms for employees. Offices can be found on the last third above-ground floor. Vertical supporting constructions on the underground floor are made of blocks filled with concrete i.e. 300 mm. On the above-ground floors rhere are vertical supporting constructions which are made by walled technology from ceramic Therm blocks i.e. 300 mm. Vertical constructions partially consist of precast wall panels and partially of monolytic panels i.e. 250 mm. The roof is designed as a flat green area. During the design processing the impact was put on increased comfort for using and overall modern concept of the object.
Preparation and organization of the production area's construction facility
Řeháček, Martin ; Stehlíková, Jana (referee) ; Vlčková, Jitka Laura (advisor)
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
Production of branded clothing in Brno
Pavlas, Antonín ; Obrtlík,, Jan (referee) ; Májek, Jan (advisor) ; Utíkalová, Ivana (advisor)
The bachelor’s thesis aimed to create the necessary levels of project documentation – Documentation for building permission and Documentation for construction. The content of the project is a new construction of the production of branded clothing in Brno by the company Glami, which will serve primarily as the production and export of finished pieces ready for sale. The building is located in Brno-Bohunice district between Kamenice, Kejbaly and Vinohrady streets and the plat is listed as one of the Brno brownfields under number 0101. The solution should také into account changes to the Urban Plan of the City of Brno in 2021 and the surrounding buildings. One of the first goals was for the construction to complement and complete the surrounding road structure. The basic masses were situated so as to respect the road lines and thus match the surrounding roads. The building is divided into three masses separated by their functions, but interconnected for easy operation. The aim was to create a functioning building with optically separated but interconnected operations.
Construction Project - Implementation of Administrative Building for Ray Service, a.s. in Staré Město
Seménka, Petr ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The content of this thesis is a construction technology project of a new office and production building for company Ray Service a.s. in Staré Město near Uherské Hradiště. The thesis contains technical reports, construction technology study, design of transport ways, technological regulations of demolition and earthworks and regulations for construction of foundation structures. Furthermore is made design of the main machine assembly, inspection and test plan and the design of the construction site, including a technical report. Finally is made a project for the construction of area roads including time plan, LEED certification, noise study and comparison of the main lifting mechanisms.

National Repository of Grey Literature : 27 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.